SUBWAY WORK

 

 

 

SHEET PILIING AND BRACING AT SIRIKIT STATION MRTA-SOUTH

 

 

 

 

BACKFILLING WORK IN THE OLD KLONG

 

 

 

 

SHEET PILING AND BRACING AT LUMPHINI STATION MRTA-SOUTH

 

 

 

 

EXCAVATOR WITH VIBRO HAMMER DRIVING SHEET PILE

 

 

 

 

SHEET PILING & BRACING FOR ENTRANCE SUBSTRUCTURE

 

 

 

 

 

WASTEWATER TREATMENT WORK

 

 

 

TREATMENT PLANT YANNAWA PROJECT

 

 

 

 

CAISSON WORK

 

 

 

 

CAISSON WORK

 

 

 

WATER PIPE WORK

 

 

 

WATER SUPPLY PLANT

 

 

 

 

WATER PIPE DIA. 3200 MM. INSTALLATION OUTSIDE RING ROAD BANGKOK

 

 

 

 

INSIDE WATER PIPE DIA. 3200 MM.

 

 

 


TRANSMISSION CONDUITS AND RELATED WORK

(LARGE WATER SUPPLY PIPE)

 

 

 

ROAD WORK